Similar products
Similar products

With Faire, shop unique wholesale products for your store from brands like Lingerie Mart and more.
Description
Kurvas Post Surgery Mastectomy Pajamas Women Surgical Recovery Robes PJ501. Offer your clients top-quality products so they can have a safe and sound recovery. This post-surgery pajama combines an excellent design that provides style, comfort, and privacy just right after leaving the OR. All your customers will be pleased once they see all the amazing features of this surgical robe. Made of peach skin fabrics that will keep the skin fresh. 4 inner pockets to carry drains or pain pumps. Perfect for after surgical procedures such as mastectomy, liposuction, and tummy tuck. Ideal design so you can wear your compression faja under it. Resistant to tension and tearing. Maintains its shapes for a long time ¾ sleeve length that eases IV access. Satin collar and cuffs. Adjustable satin belt.
Details
SKU: PJ501 Made in China
Ratings and reviews
Relevance
4.7
Brand rating ()
5
5
9
9
4
4
2
2
3
3
1
1
2
2
0
0
1
1
0
0
4.7
Quality of products
4.7
Fulfillment
4.8
Communication
No reviews for Kurvas Post Surgery Mastectomy Pajamas Women yet.
Reviews for similar products from Lingerie Mart: Robes
On the cheap side
On the cheap side
28. Apr. 2025 • Stacie • Fort Liberty, NC, United States




















































